Add the total lineal footage of KenLoc panel divided
by 250 for the required number of bags of the pancake head screws.
The total number of KenLoc panels times 6 equals the required panel HWH wood screws.
The total lineal footage of W-Valley times 4 equals the required valley HWH wood screws.
The total lineal footage of Peak Closure Trim times 2 equals the required peak closure trim HWH wood screws.
The total lineal footage of Gambrel Transition times 1 equals the required gambrel transition HWH wood screws.
The total lineal footage of Rake Wall Trim times 2 equals the required rake wall trim HWH wood screws.
The total lineal footage of Side Rake Trim times 2 equals the required side rake trim HWH wood screws.
The total lineal footage of End Wall Flashing times 1 equals the required end wall flashing HWH wood screws.
Add the total number of HWH Wood Screws and divide by 250 for the total number of bags.
The total lineal footage of Ridge Cap & Hip – Dormer Cap times 2 equals the required ridge cap & hip - dormer cap HWH metal screws.
The total lineal footage of Roof Pitch Transition times 1 equals the required roof pitch transition HWH metal screws.
The total lineal footage of End Wall Flashing times 1 equals the required end wall flashing HWH metal screws.
Add the total number of HWH Metal Screws and divide by
250 for the total number of bags.